EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MattJ
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (116)
Research
- (2)
Workshop
- (5)
Empennage
- (5)
Fuselage
- (16)
-
Farings & finishing
-
Install the wings
-
Doors- Making it Rain!
-
Some QB fixing to do
-
WIndsheild
-
Passenger strut...
-
Vertical Stab Fairing
-
Fitting the Doors...
-
Forward canopy...
-
SERVICE BULLETIN #0002
-
Fabricate wire shelves
-
Seat Belts
-
Seat Rails
-
Canopy
-
Starting AIr System
-
Setting Control tubes
Firewall
- (4)
Tail Feathers
- (1)
Wings
- (7)
Controls
- (8)
Avionics
- (10)
Lighting
- (2)
Instrument Panel
- (1)
Landing Gear
- (7)
Engine
- (12)
Propeller
- (2)
Fuel System
- (6)
Interior Finish
- (11)
Paint / Decals
- (8)
Inspection
- (3)
Tools
- (2)
Cabin AIr
- (4)
Builder Name:
Matt Jakus
-
Project:
The Airplane Factory - Sling TSi
-
VIEW REPORTS
Total Hours:
1190.7
Start/Last Date:
Dec 01, 2019 - Jan 29, 2023
Engine:
Rotax 915is
Panel:
Garmin 3X
Friendly URL:
https://eaabuilderslog.org?s=MattJ
Home or Last Project Picture
Nov 15, 2022
Farings & finishing
- (8 hours)
Category: Fuselage
Now that the wings are on it is time to get some of the finishing work done. Since my paint job is dark grey I opted for black oxide steel button heads for the finishing look. The plain steel is for the light grey
20221220_101945.jpg
20221220_102005.jpg
20221220_140534.jpg
20221220_140554.jpg
20221221_114821.jpg
20221223_112837.jpg
20230114_153406.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.